top of page

CIVIL

CIVIL

  • Infrastructure works ( Site preparation, Excavation, fence, trenching for cables & pipes, office cabinets)

  • Rehabilitation & Demolition works

  • Concrete repair work

  • Industrial building (Steel & Concrete)

  • Power Station ( construction, cables tunnels, gantries steel)

  • Housing buildings

  • Roads

PROJECTS

2012 - 2013

2014 - 2016

2017 - 2019 

On going 

  • Fire Fighting System Replacement of Groove Fittings.

  • Installation of 34.5 KV Transformers

  • Installation of Switch Gears (LV, MV, HV)

  • Design & Estimation of Fire Fighting System

  • Installation of MCC & PLC Panel

  • Construction of 380 KVA S/S at Hail-3 BSP 3039

  • Construction of 38 KVA S/S, Al-Kharj

  • Repair of Firefighting Work in AIC – PR No. PDSR 109

  • Construction of 380/230 KV S/S – Safaniyah BSP

  • Construction of 380/115/13.8 KV S/S, Dhahran South

  • Installation and testing for Uthmaniyah PP 115 KV Substation with new GIS Substation

  • Electrical Installation works- 115KV/33Kv MODON substation

  • Unified Contract for Distribution network up to 36 Kv in Nuorten Electricity Department - 5 Years

bottom of page