![logo.jpg](https://static.wixstatic.com/media/b2a62b_bca3e3507cb84d64807eae36ba9135ff~mv2.jpg/v1/fill/w_75,h_55,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/logo.jpg)
Quality & Excellent Limited Company
CIVIL
CIVIL
-
Infrastructure works ( Site preparation, Excavation, fence, trenching for cables & pipes, office cabinets)
-
Rehabilitation & Demolition works
-
Concrete repair work
-
Industrial building (Steel & Concrete)
-
Power Station ( construction, cables tunnels, gantries steel)
-
Housing buildings
-
Roads
PROJECTS
2012 - 2013
2014 - 2016
2017 - 2019
On going
-
Fire Fighting System Replacement of Groove Fittings.
-
Installation of 34.5 KV Transformers
-
Installation of Switch Gears (LV, MV, HV)
-
Design & Estimation of Fire Fighting System
-
Installation of MCC & PLC Panel
-
Construction of 380 KVA S/S at Hail-3 BSP 3039
-
Construction of 38 KVA S/S, Al-Kharj
-
Repair of Firefighting Work in AIC – PR No. PDSR 109
-
Construction of 380/230 KV S/S – Safaniyah BSP
-
Construction of 380/115/13.8 KV S/S, Dhahran South
-
Installation and testing for Uthmaniyah PP 115 KV Substation with new GIS Substation
-
Electrical Installation works- 115KV/33Kv MODON substation
-
Unified Contract for Distribution network up to 36 Kv in Nuorten Electricity Department - 5 Years
![PHOTO-2022-12-04-14-31-47.jpg](https://static.wixstatic.com/media/b2a62b_accf59041c3440ceb7ebd0cbaf26f1c5~mv2.jpg/v1/fit/w_446,h_445,q_90/b2a62b_accf59041c3440ceb7ebd0cbaf26f1c5~mv2.jpg)
![Picture1CCD.jpg](https://static.wixstatic.com/media/b2a62b_28dd19605a7a4f8184d15393fde0b64f~mv2.jpg/v1/fit/w_248,h_445,q_90/b2a62b_28dd19605a7a4f8184d15393fde0b64f~mv2.jpg)
![Picture1CC.jpg](https://static.wixstatic.com/media/b2a62b_45a40e9e5e5e4ea0acb26b1fe8686195~mv2.jpg/v1/fit/w_445,h_387,q_90/b2a62b_45a40e9e5e5e4ea0acb26b1fe8686195~mv2.jpg)